I only have six boards left. I scrape the floor for about an hour and then I have to take a break. I can’t pause too long, because CZ Becker is coming to refinish the floor at the end of the week. Yikes! We’ll be locked out of the kitchen for four days. I could, and probably should, wait till I’m gone but I really want the gratification of seeing this floor as soon as possible.